Siemens Turbogeneratore KK&K TWIN CA46 – Howden other alternative energy source














If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.




















NEW | Still under manufacturer’s warranty | Original packaging | Immediate availability
Following a long-term corporate strategy review, an industrial steam turbogenerator Howden – model KK&K TWIN CA46 is available for immediate delivery.
The unit is new, never installed nor commissioned, and supplied complete according to the original Howden offer.
The machine has already been manufactured, OEM-tested, and stored indoors, allowing the elimination of standard manufacturing lead times, which are typically associated with this type of equipment.
Scope of supply includes:
Steam turbine on skid with integrated gearbox
Synchronous generator supplied separately
⚙️ Technical configuration
Type
TWIN CA46 steam turbine
Two separate turbine casings (Steam Part A + Steam Part B)
Integrated three-shaft gearbox (two pinions + central gear)
Controlled steam extraction between HP and LP sections (included)
Design conditions
Part A – HP
Inlet pressure: 16 bar(a)
Inlet temperature: 400 °C
Exhaust pressure: 2.5 bar(a)
Steam flow rate: 10,000 kg/h
Part B – LP
Inlet pressure: 2.4 bar(a)
Inlet temperature: 223 °C
Exhaust pressure: 0.3 bar(a) (condensing / vacuum)
Steam flow rate: 5,000 – 10,000 kg/h
⚡ Electrical performance
Gearbox output speed: 1,500 rpm
Mechanical power at coupling: up to 1,658 kW
Electrical power at terminals: up to 1,595 kW
? Electrical generator (supplied separately)
Three-phase synchronous generator
Rated power: 1,994 kVA
Voltage: 6 kV
Frequency: 50 Hz
Power factor: 0.8
Rated speed: 1,500 rpm
Efficiency: up to 96.19%
Protection degree: IP44 R
Cooling system: IC31 – air-cooled, self-ventilated
Brushless execution with integrated excitation
Designed for parallel operation with the grid
?️ Included auxiliaries
Integrated oil system in the base frame (lubrication and control)
Main mechanical oil pump
Auxiliary electric oil pump
Water-cooled oil heat exchanger
Duplex oil filter
Skid base with integrated oil tank
Flexible coupling with safety guard
?️ Control, protection and panels
SC901 electronic speed governor
Live steam pressure control
Extraction steam pressure control
Independent overspeed protection device
Operating modes:
Grid parallel
Island mode
Local skid-mounted control panel
Separate control and protection panel Siemens SIPROTEC 5
PROFINET interface
ENC-RfG turbogenerator simulation model included
Automatic drain valves (supplied loose)
? Typical applications
Industrial cogeneration plants
Energy recovery from process steam
Biomass and waste-to-energy plants
Combined production of electric power and process steam
⭐ Key advantages
New machine, never installed nor commissioned
Immediate availability → elimination of manufacturing lead times (approx. 2–3 years)
Complete OEM solution, supplied according to original Howden scope
High operational flexibility (grid parallel / island mode, steam extraction)
Ideal for projects with tight schedules or revamping of existing plants
? Status and conditions
Condition: NEW
Year of manufacture: end of 2024
Never installed – never started
Stored in indoor environment
Complete Howden technical documentation available
Installation and commissioning on site available directly from the manufacturer
? PRICE: Upon request
Further technical information and documentation available upon request.